  • Add the work done per hour: 1/a + 1/b.
  • Together is always faster than the faster one alone.

The usual trap

Averaging the two times.

Three worked examples

Example 1

One pump finishes a tank in 4 hours. A second pump finishes the same job in 12 hours. Working together, how long do they take?

  1. 3 hours(correct answer)
  2. 2 hours
  3. 5 hours
  4. 1 hour
  5. 4 hours

Answer: A, 3 hours

  1. In one hour the first does 1/4 of the job and the second does 1/12.
  2. Together that is 1/4 + 1/12 = 1/3 of the job per hour.
  3. So the whole job takes 48 ÷ 16 = 3 hours.

Example 2

One crew finishes a paving job in 15 hours. A second crew finishes the same job in 30 hours. Working together, how long do they take?

  1. 20 hours
  2. 45 hours
  3. 15 hours
  4. 13 hours
  5. 10 hours(correct answer)

Answer: E, 10 hours

  1. In one hour the first does 1/15 of the job and the second does 1/30.
  2. Together that is 1/15 + 1/30 = 1/10 of the job per hour.
  3. So the whole job takes 450 ÷ 45 = 10 hours.

Example 3

One machine finishes a batch of orders in 20 hours. A second machine finishes the same job in 30 hours. Working together, how long do they take?

  1. 8 hours
  2. 9 hours
  3. 11 hours
  4. 10 hours
  5. 12 hours(correct answer)

Answer: E, 12 hours

  1. In one hour the first does 1/20 of the job and the second does 1/30.
  2. Together that is 1/20 + 1/30 = 1/12 of the job per hour.