Working together
Two workers or machines share a job; find how long it takes together.
Drill, answers shown as you go
00:00
Each answer is checked and explained before the next question.
How to spot it
- Add the work done per hour: 1/a + 1/b.
- Together is always faster than the faster one alone.
The usual trap
Averaging the two times.
Three worked examples
Example 1
One pump finishes a tank in 4 hours. A second pump finishes the same job in 12 hours. Working together, how long do they take?
- 3 hours(correct answer)
- 2 hours
- 5 hours
- 1 hour
- 4 hours
Answer: A, 3 hours
- In one hour the first does 1/4 of the job and the second does 1/12.
- Together that is 1/4 + 1/12 = 1/3 of the job per hour.
- So the whole job takes 48 ÷ 16 = 3 hours.
Example 2
One crew finishes a paving job in 15 hours. A second crew finishes the same job in 30 hours. Working together, how long do they take?
- 20 hours
- 45 hours
- 15 hours
- 13 hours
- 10 hours(correct answer)
Answer: E, 10 hours
- In one hour the first does 1/15 of the job and the second does 1/30.
- Together that is 1/15 + 1/30 = 1/10 of the job per hour.
- So the whole job takes 450 ÷ 45 = 10 hours.
Example 3
One machine finishes a batch of orders in 20 hours. A second machine finishes the same job in 30 hours. Working together, how long do they take?
- 8 hours
- 9 hours
- 11 hours
- 10 hours
- 12 hours(correct answer)
Answer: E, 12 hours
- In one hour the first does 1/20 of the job and the second does 1/30.
- Together that is 1/20 + 1/30 = 1/12 of the job per hour.
- So the whole job takes 600 ÷ 50 = 12 hours.